Monday, October 19, 2009

Kitchen Progress

Today is not a fun day with the kitchen remodel. The first setback is Saturday evening, after all the monsoon rains, a previous roof leak reappeared in the dining room. Which means the sheetrock is wet and will have to be patched after the roofing company comes back to repair the roof once again. Then the cabinets arrived today, and not without their set of problems. The corner sink cabinet arrived 3" shorter than the plans, thus making the sink selection I was planning on impossible. So, I am back to looking at sinks that will fit the cabinet. The contractor we finally decided (and my personal hero), will shim the cabinet to make it all work. I can see that this project will result in more wine than expected.........

No comments:

Post a Comment